Missrifka.com
Top rifka sites |
- Title
- Miss Rifka
- Meta Description
- This website provides you basic information required as process engineer or project engineer in wide range of projects, starting from feasibility study, basic engineering design, front-end engineering design, EPC, precommissioning, and commissioning in variety of industries, such as oil and gas, metal, and chemical industry.
- Meta Keywords
- chemical engineer, process engineer, lng, indonesia engineer, process engineering, chemical engineering, regas, gas, boiler, energy, energy management, suply chain, LNG, LNG storage tank, LNG project, LNG terminal, LNG regasification, boil-off gas, LNG vaporizer, LNG station, LCNG station, LNG pump, LNG recirculation, LNG cold recovery, typical P&ID of LNG receiving terminal, front-end engineering design, city gas, city gas network, city gas flow rate calculation, energy audit, water audit, energy issue, renewable energy, feasibility study, bankable feasibility study, difference between feasibility study and pre-feasibility study, basic engineering design, cooling tower performance, sizing of thermal expansion tank, sizing of jockey pump, process engineer job description, project engineer job description, working at consultant company, EPC project, gas processing, nitrogen supply system, pump terminology, sizing of instrument air compressor, water treatment plant, wastewater ...
- Technologies in use
- WordPress, Bootstrap, AddThis, jQuery, spin.js, twemoji, Facebook, Modernizr, Font Awesome
X-Powered-By | PHP/5.6.33 |
Expires | Thu, 19 Nov 1981 08: |
Cache-Control | no-store, no-cache, |
Pragma | no-cache |
Content-Type | text/html; charset=U |
Transfer-Encoding | chunked |
Content-Encoding | gzip |
Vary | Accept-Encoding |
Accept-Ranges | bytes |
Server | LiteSpeed |
Alt-Svc | quic=":443"; ma=2592 |
Connection | close |